- Gathered foam for construction and began to cut.
- Cut all foam and began to assemble.
- Got battery and set all electronics in place.
- All foam assembled and gluing begins, now to wait for drying
Sub-note
- Day 2 of plans to take over the world being in place.
- The world will soon be ours for the taking as soon as our flying beast is in the air
- Dissected the plane and removed all required parts that we
are planning on using.
- Discussed design and planning of the body for the plane.
- Current plan: Scrapped all current plastic and plan now on
rebuilding the entire body using an alpha wing design with the current motors
and possibly more servos for the flap controls.
- Plans to take over the world set in place.