Friday, May 24, 2013

Day 2


  • Gathered foam for construction and began to cut.
  • Cut all foam and began to assemble.
  • Got battery and set all electronics in place.
  • All foam assembled and gluing begins, now to wait for drying
Sub-note
  • Day 2 of plans to take over the world being in place.
    • The world will soon be ours for the taking as soon as our flying beast is in the air

Day 1


  • Dissected the plane and removed all required parts that we are planning on using.
  • Discussed design and planning of the body for the plane.
  • Current plan: Scrapped all current plastic and plan now on rebuilding the entire body using an alpha wing design with the current motors and possibly more servos for the flap controls.
  • Plans to take over the world set in place.